1964
1967
1974
1987
1992
TNVs in Ridgeway
In Ridgeway, the switch cabinets and electrical connection capacities for the boiler house/heat generation, press heating systems, cold water units for the paint shops and the hot water heating system were implemented.
1995
1997
Dr Andreas J. Ness joins the Executive Board
Dr Andreas J. Ness, who has been with the company since 1989, becomes the sole managing director of NESS Wärmetechnik GmbH.
First steam thermal oil plant
First steam thermal oil plant in Wismar (94 bar)
1999
1999
TNV in Düren
Construction of a thermal afterburning plant (35,000 m³N/h) with air preheating – including exhaust air supply, fan system (200 kW), air preheater, combustion chamber with natural gas burner, switchgear and process control system in Düren.
Dietmar B. Ness joins the management board
Dietmar B. Ness joins the management team at NESS Wärmetechnik GmbH.
2001
2002
Project in Ningbo, China and Taiwan
NESS manufactures and supplies heating devices to Ningbo, China and Taiwan.
Implementation of FF500
NESS successfully implements FF500 – including planning, delivery and commissioning of the necessary systems
2005
2011
Introduction of the Nald 250
Introduction of the Nald 250 at Stadtwerk Neckarsulm
2013
2014
Large-scale project Biomass 30MW
30 MW dust-fired thermal oil system in the USA
2016
2018
Large-scale project Biomasse 35MW
35 MW dust-fired thermal oil system in Latvia
Large-scale project with 6 MW for thermal oil evaporation
Planning and construction of a plant in which thermal oil is evaporated in order to regulate the process temperature more precisely. Redundant design of heaters and fuel (natural gas and methanol).
2022
2022
Ness goes Social
Launch of social media and authentic insights into the company
Ness solar system
Own PV system for energy requirements of production and administration
2023
2024
NESS America
Establishment of Ness Wärmetechnik America Inc. in Charlotte, NC